- Location Evans Avenue, Eastlakes
- Client Crown Group
- Contract Value $23 million
- Completion June 2019
Excavation & Earthworks
Eastlakes Shopping Centre
Description of Work
Design and construct a 3 level basement excavation in water charged sand, including the following;
– Demolition
– CSM shoring wall and temporary ground anchors
– Capping beam
– Suspended concrete loading platform
– Bulk excavation
– De-watering
– Sheet piling
– Foundation Piling
– Waterproofing
– Hydrostatic raft slabs