Excavation & Earthworks

Eastlakes Shopping Centre

  • Location Evans Avenue, Eastlakes
  • Client Crown Group
  • Contract Value $23 million
  • Completion Estimated April 2019

Description of Work

Design and construct a 3 level basement excavation in water charged sand, including the following;
– Demolition
– CSM shoring wall and temporary ground anchors
– Bulk excavation
– Dewatering
– Sheet piling
– Structural concrete capping beam, loading platform, basement raft slabs and walls
– Waterproofing