Structures

Orora Water Treatment Plant

  • Location B9 Paper Mill, Botany Rd Matraville
  • Client Orora Pty Ltd
  • Contract Value $5 million
  • Completion June 2017

Description of Work

Upgrade of existing dam and pump station
– New sheet piled wall
– Tubular steel piles
– Installation of pontoon and pump building

Civil and structural works for a new water treatment plant within the paper mill
– Earthworks
– Structural concrete slabs, retaining walls and tank stands
– Drainage
– Supply and installation of structural steel building

Rejects Area upgrade
– Construct concrete slab and walls with radius curve incorporating steel rails
– Supply and install structural steel wall